Search
Search
Close this search box.

Bridge Construction Silt Curtain

Chatoyer silt curtain Sunshine Coast river

Maroochydore on Queensland’s Sunshine Coast is undertaking a large redevelopment of its CBD. One of our clients was involved in the construction of a new bridge as part of a road upgrade, with Class 2 Silt Curtain utilised to create a settlement area and ensure that suspended solids did not escape the work area.

Project Overview

Date: January, 2015

Location: Maroochydore, QLD, Australia

Features Summary

Silt Curtain Length:150.0m
Silt Curtain Depth:2.0m with tapered skirt to best fit application
Silt Curtain Material:
Class 2 Silt Curtain with Non woven 240gsm geotextile, 610gsm PVC and 100mm floats

Project Summary

  • A standard bridge building project as part of the Maroochydore CBD redevelopment
  • Two runs of 75m Class 2 Silt Curtain were placed on either side of the bridge to ensure a settlement area

Hi there.

Want to get in touch?

Drop us a line

Login to your
direct reseller account